You don't have javascript enabled. Good luck with that.
Pencarian
Penertiban Kemang Tunggu Peta Bidang dari BPN

Kemang Controlling Awaits BPN’s Inventory Map

Jakarta Provincial Government still awaits the inventorying map from National Land Board (BPN) before normalizing Krukut river. As planned before, buildings without certificate in Kemang, South Jakarta will be dismantled.

We’ll prepare the trace right after getting the map from BPN

Jakarta Governor, Basuki T. Purnama said Jakarta Dept. of City Spatial Planning will determine the trace based on the map from BPN.

“We’ll prepare the trace right after getting the map from BPN,” he said, Wednesday (10/5).

City Analyzed Cause of Flooding in Kemang

There are 505 buildings impacted by the project. Some of the buildings have certificate. But buildings without certificate will be demolished first.

Basuki added that the dismantling is aimed to support river normalization project. Buildings along the riverbank causes Kemang area is always flooded.

Linked News
Popular News indeks
  1. May Day: Transjakarta Service Adjustments

    access_time01-05-2026 remove_red_eye818 personAldi Geri Lumban Tobing
  2. Dinkes Sets Up Health Posts for May Day Events

    access_time01-05-2026 remove_red_eye567 personDessy Suciati
  3. The Lights-Out Action Successfully Reduces Carbon Emissions

    access_time27-04-2026 remove_red_eye562 personAldi Geri Lumban Tobing
  4. City Deploys Massive Cleanup Force for May Day at Monas

    access_time01-05-2026 remove_red_eye560 personAldi Geri Lumban Tobing
  5. MRT Jakarta Urged to Enhance Power Outage Mitigation System

    access_time27-04-2026 remove_red_eye547 personFakhrizal Fakhri